Handmade quality · Free shipping over $75 · Explore the atelier

B10 Summary Sheet - Post Frame Installation and Temporary Restraint and Bracing (50 copies) B6 Summary Sheet bracing guidelines to prevent wall

SKU: 83114358434

4.9
USD114.00 USD152.00

Pay in 4 interest-free payments of $28.50 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 2 - Aug 7

Description

bracing guidelines to prevent wall panels from toppling during erection

customized to reflect local standards and practices

tips for lifting wall panels

Component Warning Notice

00  Non-Member Price $305

B10 Summary Sheet - Post Frame Installation and Temporary Restraint and Bracing (50 copies) B6 Summary Sheet bracing guidelines to prevent wallPlease note that recommendations for the installation and bracing of trusses spaced more than two feet on center has been moved to the new BCSI B6 Summary Sheet. Metal plate connected wood trusses are commonly used in post frame construction. This Summary Sheet provides guidelines for the proper bracing of engineered post frame building systems. Includes English Spanish. Contains 50 copies. Pricing Member Price* $41. 00 Non Member Price $114. 00 *Must

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products